Abstract

Assetmanagement en Maintenance 0.6
Couple the policy towards Maintenance activity

The responsibilities between Assetowner and contractor in the technical management and maintenance of buildings has been some time shifting. Accountability, risk, coordination and technical expertise are increasingly invested with the command acquirer in concepts such as PPS, Integrated Management & Performance contracts or Maincontracting. Target instance. The government to manage their Asset Portfolio in unforeseeable time such maintenance concepts.

 

The sector is thus in motion and both the client and the contractor jointly innovate to higher contract. The manner in which they fulfill and implement given is based on experience, best practice and application of current knowledge. There is no scientific research done to this development, and specifically to the growth model of the maintenance concepts in the Netherlands.

Now there’s PhD research started into technical management and maintenance concepts Maincontracting, Integrated Management contracts, Integral Performance Contracts as E & K ed.

The study distinguishes itself by individual market participants in this study participate financially contribute to innovate the information and together. The investigation in addition to his assignment formulation five defined research.

 

Assignment

 
Groeimodel 10
Groeimodel gebaseerd op de NEN 2767-1 methode

Assignment research process:

“Set the framework (ruler) by which the quality of technical management and maintenance concepts can be tested, for example, Main Contracting, by introducing to maturity of these concepts. The developed framework must be applicable to the government, (commercial) real estate owners and providers of technical management and maintenance services. “

 

Research Design 

 
Onderzoeksmodel Abstract V0.01
Onderzoeksontwerp

These qualitative descriptive study. Be investigated by the Phase Contract Formation (central), the Contract Implementation Phase (CI) and Contract Development Period (CR) that the defects may be maintenance related processes. These shortcomings of the known processes can be optimized is by the client and contractor with the aim of the highest possible performance. Determining the “Asset management flaws” will be based on research and case studies, survey and Delphi.


Onderzoeksresultaten

Result 1Result 2Result 3Result 4Result 5
A common research on the fundamental principles “Maincontracting” should be based (modeling) and to which it must be an answer.
A valid research that “Maincontracting” must meet. (Modeling) 
 A model that “Maincontracting” defines which processes can be optimized and forecast. (Modeling)

A valid study how government, the (commercial) real estate owners and suppliers optimal “Maincontracting” carry out in order to achieve set goals. These may be;

  • Gains and / or return
  • business Objectives
  • Optimization of internal processes
  • Optimization of external processes
Disclosure of knowledge secured by (continuing) education.